Cripton Engineering was the Main Contractor for the Singapore Discovery Centre Solar project, delivering a 1.7 MWp Net-Zero system.
🏆 Singapore Book of Records Holder
Recognized by the Singapore Book of Records as the ‘Longest Sheltered Walkway Fitted with Solar Panels’ (196 Meters).

Project Snapshot
- Project Site: Singapore Discovery Centre (510 Upper Jurong Rd)
- Project Name: Singapore Discovery Centre Solar Transformation.
- System Size: 1,700 kWp (1.7 MWp)
- Role: Main Contractor (Turnkey EPC)
- System Type: Hybrid Deployment (BIPV Walkway + Rooftop Solar + Floating Solar PV)
- Key Achievement: Powering Singapore’s First Net-Zero Energy Museum
The Challenge
The Singapore Discovery Centre aimed to become a “Net-Zero Energy Museum,” requiring a massive renewable energy overhaul. As the Main Contractor, Cripton was tasked with transforming the campus infrastructure—including existing walkways and water bodies—into active power-generating assets without disrupting the visitor experience.
Why We Built the Singapore Discovery Centre Solar System
The Engineering Solution
Cripton delivered a multi-phase engineering feat that now holds a national record:
- The Record-Breaking Walkway: We designed and constructed a 196-meter solar-integrated shelter. This dual-purpose structure provides weather protection for visitors while serving as a linear power plant.
- Campus-Wide Integration: Beyond the walkway, we deployed thousands of panels across the main building roof and the discovery lake (floating PV), creating a unified microgrid that offsets the centre’s energy consumption.
The Result
This project is a landmark in Singapore’s Green Plan 2030. The Singapore Discovery Centre Solar system successfully delivers Net-Zero energy, proving that functional infrastructure can be transformed into sustainable icons.
Project Gallery





FAQs About the Singapore Discovery Centre Project
What is the capacity of the system? The Singapore Discovery Centre system has a total capacity of 1.7 MWp, generating enough energy to offset the facility’s consumption.
Is it a Net-Zero building? Yes, this project helped the Singapore Discovery Centre become the first Net-Zero Energy museum in Singapore.
Who was the Main Contractor? Cripton Engineering served as the EPC (Engineering, Procurement, and Construction) Main Contractor.
See how we engineer large-scale rooftop and floating systems on our Commercial Solar PV Systems page.